You are here

Konecranes delivery to the plant:

Two Gantry Cranes,
One (1) pulpit chair,
One (1) Remote Operator Station (ROS),
One (1) Main User Interface (MUI) which interfaces with both cranes,
Two (2) sets of electrical control panels (one for each crane), Three (3) orange peel grapples as well as semi and full 3-shift automation capabilities.