The animation shows a Konecranes Die Gripper Crane in a Stamping Plant at a Press Line with five moving bolsters on both sides of Press doing a die set change. Four dies are taken from Press bolsters back to warehouse and a new set of four is moved from warehouse to bolsters. Idle station for bolster number 5 is not shown in the animation for simplification.
In this animation, there is one warehousing rule: die number 1 for bolster number 1 must always be the bottommost die on the floor. This affects the die change sequence. A Konecranes Warehouse Management System, WMS, has all the warehousing rules in its database and WMS is giving all the transfer instructions to crane PLC.